Material and Additional Cost Lines

Overview

Material and Additional cost lines are two of the three cost types on a calculation — see Work and Routing Lines for the third.

Material lines

The Material subform shows Item-type lines auto-generated from the item's Production BOM (exploded recursively through sub-BOMs). Each line has:

Field Description
No. / Description The component item.
Quantity / Unit of Measure How much of the component is needed.
Unit Cost / Line Amount The component's cost and the resulting line total.
Vendor No. The component's vendor, if relevant.
Purchase Status, Purchase Document No./Line No., Purchase Price Optional links to a purchase requisition or order used to source the material.
System Created Indicates the line was generated automatically rather than entered manually.

New lines added manually on the Material subform default to Type = Item.

Additional lines

The Additional subform uses the same layout, but new lines default to Type = Additional. Use it for manually entered costs that aren't part of the item's BOM or Routing — for example freight, packaging, or other surcharges.

Grouping and sub-totals

Lines support Line Type (Heading, Total, Begin-Total, End-Total) and Indentation, letting you group and sub-total cost lines similarly to a standard BOM.